The process
From the first phone call to the first re-oil.
Most floor companies hand you off three times: a salesman, an installer, a finisher. We never have. The person who walks your house on day one is the person who oils the last board on day fourteen.
Step 01
Consultation in your home
We come to you with a curated stack of samples chosen for your light, your subfloor, and how the room is actually used. No showroom small talk — we measure, we listen, we sketch.
- Duration
- 60 – 90 minutes
- Deliverable
- A written scope and material shortlist within 48 hours.

Step 02
Measure, sample, scope
Our installer returns to lay out full-size samples in your space, check the slab for moisture, and confirm the plan. You see exactly how the floor will read at sunrise and at lamplight.
- Duration
- 1 site visit
- Deliverable
- Fixed-price quote, install calendar, and material lead time.

Step 03
Install — dust-controlled, on-time
Crews of two to four, vacuum-shrouded sanders, plastic-sealed work zones, and a single point of contact on your phone. We start when we said we'd start and finish when we said we'd finish.
- Duration
- 3 – 14 days typical
- Deliverable
- Daily progress photos and a walk-through at handover.

Step 04
Finish, hand-over, aftercare
Oil or polyurethane applied in-situ, full cure protected, every threshold dressed by hand. You get a care kit, a touch-up bottle, and a calendar reminder for the first re-oil.
- Duration
- 2 – 3 days finishing
- Deliverable
- 25-year workmanship warranty + lifetime aftercare booking.

What you can count on
Four promises we've kept since 2007.
Dust, contained.
HEPA-shrouded sanders, plastic-sealed work zones, daily clean-down. The vast majority of clients sleep at home through the install.
On the day we said.
We confirm a fixed install date the moment your materials land in the workshop. We've started a job on the wrong day exactly twice in 18 years.
Twenty-five-year workmanship warranty.
On every single install. Transferable to new owners. One phone call brings a Northwind installer back on site, no questions.
One number to call.
The craftsman who quoted the job is the craftsman who finishes it. You'll have their direct number from day one to the first re-oil.
Ready when you are
Eighteen years of practice. Available next week.
Our calendar runs about six weeks out for full installs and two weeks for refinishes. Tell us the room — we'll send back the next available date.